Kamloops Heritage Railway Up and Running, Aug 2015

After 2 years of hard work by us at the KHR, engine 2141 is preforming like a champ again. The first public rides were on Saturday Aug 22nd. I was the fireman and Robert was the engineer. We did 2 runs and a good time was had by all.

2141 khr Kamloops station
Engine 2141 at Kamloops station
2141, khr
Engine 2141
khr 2141
2141

 

engine 2141
Yours Truly in the cab

One thought on “Kamloops Heritage Railway Up and Running, Aug 2015”

Leave a Reply

Your email address will not be published. Required fields are marked *

 

This site uses Akismet to reduce spam. Learn how your comment data is processed.